{"id":13461,"date":"2022-09-27T11:02:27","date_gmt":"2022-09-27T09:02:27","guid":{"rendered":"https:\/\/www.revistanuclear.es\/uncategorized\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/"},"modified":"2022-09-26T09:26:27","modified_gmt":"2022-09-26T07:26:27","slug":"renewal-of-the-operating-permit-of-asco-nuclear-power-plant","status":"publish","type":"post","link":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/","title":{"rendered":"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant"},"content":{"rendered":"<span class=\"su-dropcap su-dropcap-style-simple\" style=\"font-size:2.5em\">T<\/span>he Ministry for Ecological Transition and the Demographic Challenge has renewed the Asc\u00f3 nuclear power plant Operating Permit. So, unit 1 will be able to continue operating for a further 9 years and unit 2 for further 10 years.<\/p>\n<p>The Nuclear Safety Council, after having analyzed all the submitted documentation by ANAV, issued a favorable report based &#8220;<em>both on the verification of the correct operation of the plant and the maintenance of the adequate level of safety to continue its operation, and on the verification of the capacity of the facility to respond to current regulatory requirements that are more demanding than those strictly required in its original design<\/em>&#8220;.<\/p>\n<p>With this new Operating Permit, all the plants operated by ANAV will enter the so-called long-term operation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>he Ministry for Ecological Transition and the Demographic Challenge has renewed the Asc\u00f3 nuclear power plant Operating Permit. So, unit 1 will be able to continue operating for a further 9 years and unit 2 for further 10 years. The Nuclear Safety Council, after having analyzed all the submitted documentation by ANAV, issued a favorable report based &#8220;both on the verification of the correct operation of the plant and the maintenance of the adequate level of safety to continue its [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":13459,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"video","meta":{"_acf_changed":false,"mc4wp_mailchimp_campaign":[],"footnotes":""},"categories":[68],"tags":[2652,1763,1250,91,2653,2651,945,85],"coauthors":[183],"class_list":["post-13461","post","type-post","status-publish","format-video","has-post-thumbnail","hentry","category-installations","tag-authorization","tag-csn-en","tag-engineering","tag-nuclear-en","tag-operation-en","tag-renovation","tag-sharing","tag-video-en","post_format-post-format-video"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant - Installations<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant - Installations\" \/>\n<meta property=\"og:description\" content=\"he Ministry for Ecological Transition and the Demographic Challenge has renewed the Asc\u00f3 nuclear power plant Operating Permit. So, unit 1 will be able to continue operating for a further 9 years and unit 2 for further 10 years. The Nuclear Safety Council, after having analyzed all the submitted documentation by ANAV, issued a favorable report based &#8220;both on the verification of the correct operation of the plant and the maintenance of the adequate level of safety to continue its [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"Revista Nuclear Espa\u00f1a\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SNE.spain\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-27T09:02:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2022\/09\/grandeasco.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SNE\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@SNEu235\" \/>\n<meta name=\"twitter:site\" content=\"@SNEu235\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SNE\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/\"},\"author\":{\"name\":\"SNE\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#\\\/schema\\\/person\\\/e3730eac0e437112480f1a88d78d7b82\"},\"headline\":\"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant\",\"datePublished\":\"2022-09-27T09:02:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/\"},\"wordCount\":140,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/grandeasco.jpg\",\"keywords\":[\"authorization\",\"CSN\",\"Engineering\",\"Nuclear\",\"operation\",\"renovation\",\"sharing\",\"video\"],\"articleSection\":[\"Installations\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/\",\"name\":\"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant - Installations\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/grandeasco.jpg\",\"datePublished\":\"2022-09-27T09:02:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/grandeasco.jpg\",\"contentUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/grandeasco.jpg\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/installations\\\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/\",\"name\":\"Revista Nuclear Espa\u00f1a\",\"description\":\"Revista de los profesionales del sector nuclear en Espa\u00f1a cuya misi\u00f3n es la divulgaci\u00f3n de la ciencia y tecnolog\u00eda nuclear. El objetivo de la Revista es la publicaci\u00f3n de art\u00edculos y contenidos de car\u00e1cter t\u00e9cnico y divulgativo, en diversas \u00e1reas tem\u00e1ticas como son clima y medioambiente, transici\u00f3n energ\u00e9tica, instalaciones nucleares y radiactivas, tecnolog\u00eda nuclear e innovaci\u00f3n, seguridad nuclear y protecci\u00f3n radiol\u00f3gica, ciclo de combustible, residuos radiactivos.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#organization\",\"name\":\"SPANISH NUCLEAR SOCIETY\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/avatar-NE.jpg\",\"contentUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/avatar-NE.jpg\",\"width\":512,\"height\":512,\"caption\":\"SPANISH NUCLEAR SOCIETY\"},\"image\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SNE.spain\",\"https:\\\/\\\/x.com\\\/SNEu235\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#\\\/schema\\\/person\\\/e3730eac0e437112480f1a88d78d7b82\",\"name\":\"SNE\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/sne_logo-100x100.jpgd6d7d2b58a5ebc2f7e6ffd1b8ce7d6f2\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/sne_logo-100x100.jpg\",\"contentUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/sne_logo-100x100.jpg\",\"caption\":\"SNE\"},\"description\":\"Redacci\u00f3n Sociedad Nuclear Espa\u00f1ola\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/author\\\/webmaster_sne\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant - Installations","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/","og_locale":"en_US","og_type":"article","og_title":"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant - Installations","og_description":"he Ministry for Ecological Transition and the Demographic Challenge has renewed the Asc\u00f3 nuclear power plant Operating Permit. So, unit 1 will be able to continue operating for a further 9 years and unit 2 for further 10 years. The Nuclear Safety Council, after having analyzed all the submitted documentation by ANAV, issued a favorable report based &#8220;both on the verification of the correct operation of the plant and the maintenance of the adequate level of safety to continue its [&hellip;]","og_url":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/","og_site_name":"Revista Nuclear Espa\u00f1a","article_publisher":"https:\/\/www.facebook.com\/SNE.spain","article_published_time":"2022-09-27T09:02:27+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2022\/09\/grandeasco.jpg","type":"image\/jpeg"}],"author":"SNE","twitter_card":"summary_large_image","twitter_creator":"@SNEu235","twitter_site":"@SNEu235","twitter_misc":{"Written by":"SNE","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/#article","isPartOf":{"@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/"},"author":{"name":"SNE","@id":"https:\/\/www.revistanuclear.es\/en\/#\/schema\/person\/e3730eac0e437112480f1a88d78d7b82"},"headline":"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant","datePublished":"2022-09-27T09:02:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/"},"wordCount":140,"commentCount":0,"publisher":{"@id":"https:\/\/www.revistanuclear.es\/en\/#organization"},"image":{"@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2022\/09\/grandeasco.jpg","keywords":["authorization","CSN","Engineering","Nuclear","operation","renovation","sharing","video"],"articleSection":["Installations"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/","url":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/","name":"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant - Installations","isPartOf":{"@id":"https:\/\/www.revistanuclear.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/#primaryimage"},"image":{"@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2022\/09\/grandeasco.jpg","datePublished":"2022-09-27T09:02:27+00:00","breadcrumb":{"@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/#primaryimage","url":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2022\/09\/grandeasco.jpg","contentUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2022\/09\/grandeasco.jpg","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/www.revistanuclear.es\/en\/installations\/renewal-of-the-operating-permit-of-asco-nuclear-power-plant\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.revistanuclear.es\/en\/"},{"@type":"ListItem","position":2,"name":"Renewal of the Operating Permit of Asc\u00f3 Nuclear Power Plant"}]},{"@type":"WebSite","@id":"https:\/\/www.revistanuclear.es\/en\/#website","url":"https:\/\/www.revistanuclear.es\/en\/","name":"Revista Nuclear Espa\u00f1a","description":"Revista de los profesionales del sector nuclear en Espa\u00f1a cuya misi\u00f3n es la divulgaci\u00f3n de la ciencia y tecnolog\u00eda nuclear. El objetivo de la Revista es la publicaci\u00f3n de art\u00edculos y contenidos de car\u00e1cter t\u00e9cnico y divulgativo, en diversas \u00e1reas tem\u00e1ticas como son clima y medioambiente, transici\u00f3n energ\u00e9tica, instalaciones nucleares y radiactivas, tecnolog\u00eda nuclear e innovaci\u00f3n, seguridad nuclear y protecci\u00f3n radiol\u00f3gica, ciclo de combustible, residuos radiactivos.","publisher":{"@id":"https:\/\/www.revistanuclear.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.revistanuclear.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.revistanuclear.es\/en\/#organization","name":"SPANISH NUCLEAR SOCIETY","url":"https:\/\/www.revistanuclear.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.revistanuclear.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2019\/11\/avatar-NE.jpg","contentUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2019\/11\/avatar-NE.jpg","width":512,"height":512,"caption":"SPANISH NUCLEAR SOCIETY"},"image":{"@id":"https:\/\/www.revistanuclear.es\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SNE.spain","https:\/\/x.com\/SNEu235"]},{"@type":"Person","@id":"https:\/\/www.revistanuclear.es\/en\/#\/schema\/person\/e3730eac0e437112480f1a88d78d7b82","name":"SNE","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/01\/sne_logo-100x100.jpgd6d7d2b58a5ebc2f7e6ffd1b8ce7d6f2","url":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/01\/sne_logo-100x100.jpg","contentUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/01\/sne_logo-100x100.jpg","caption":"SNE"},"description":"Redacci\u00f3n Sociedad Nuclear Espa\u00f1ola","url":"https:\/\/www.revistanuclear.es\/en\/author\/webmaster_sne\/"}]}},"_links":{"self":[{"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/posts\/13461","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/comments?post=13461"}],"version-history":[{"count":1,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/posts\/13461\/revisions"}],"predecessor-version":[{"id":22813,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/posts\/13461\/revisions\/22813"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/media\/13459"}],"wp:attachment":[{"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/media?parent=13461"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/categories?post=13461"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/tags?post=13461"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/coauthors?post=13461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}