{"id":4631,"date":"2020-05-08T15:27:04","date_gmt":"2020-05-08T14:27:04","guid":{"rendered":"https:\/\/www.revistanuclear.es\/?p=4631"},"modified":"2020-04-29T15:25:41","modified_gmt":"2020-04-29T14:25:41","slug":"application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project","status":"publish","type":"post","link":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/","title":{"rendered":"Application of coatings on the Tokamak reactor building for the ITER international project"},"content":{"rendered":"<div class=\"rn-icon-panel__wrap\" style=\"display:flex;justify-content:flex-start;\"><a class=\"rn-icon-panel descargar\" href=\"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/TOKAMAK.pdf\" target=\"_blank\" rel=\"noopener noreferrer nofollow\" style=\"--rn-bg:#8baf31;--rn-color:#ffffff;--rn-border:0px solid;--rn-shadow:0px 0px 0px;--rn-rounded:12px;--rn-padding:14px;--rn-gap:10px;--rn-icon-size:30px;\"><span class=\"rn-icon-panel__icon\" aria-hidden=\"true\"><img src=\"https:\/\/revistanuclear.es\/wp-content\/uploads\/2022\/12\/click.png\" alt=\"\" loading=\"lazy\" decoding=\"async\" \/><\/span><span class=\"rn-icon-panel__text\">SEE FULL VERSION<\/span><\/a><br><\/div><span class=\"su-dropcap su-dropcap-style-simple\" style=\"font-size:2.5em\">S<\/span>ince June 2019, GDES has been participating in the construction of the platform buildings of the ITER project. We have been tasked with applying specific coatings on the building under construction where the machine will be located and its annex buildings: Tokamak, Diagnostic and Tritium.<\/p>\n<p>The services of GDES Group were engaged by FUSION FOR ENERGY (F4E), the EU body that manages the EU\u2019s contribution to the ITER project and the construction of the platform buildings. This service will be performed over the next 3 years and will involve up to 40 workers from our French subsidiary, which specialises in surface treatments, industrial paints and coatings. The ITER project (\u201cthe way\u201d in Latin) is one of the most ambitious energy projects in the world. The facilities are located in Cadarache, in southern France, and 35 countries are collaborating to build the world\u2019s first fusion reactor on an industrial scale to <strong>prove the feasibility of fusion as a large-scale and carbon-free source of energy<\/strong> based on the same principle that powers our Sun and stars.<\/p>\n<p>Our contribution to the construction of its main buildings, both the building that will house the fusion reactor and the buildings for achieving deuterium-tritium plasma, is a project of major budgetary, technical and strategic value in the field of research and technological development.<\/p>\n<p>The mission of GDES in this project is to apply different specific coatings to 73,600 m<sup>2<\/sup>of the interior of the buildings, with an option to extend the total area to approximately 120,000 m<sup>2<\/sup>.<\/p>\n<figure id=\"attachment_4623\" aria-describedby=\"caption-attachment-4623\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1.jpg\"><img loading=\"lazy\" decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-4623\" src=\"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1.jpg\" alt=\"\" width=\"1100\" height=\"689\" srcset=\"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1.jpg 1100w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-300x188.jpg 300w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-1024x641.jpg 1024w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-770x482.jpg 770w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-500x313.jpg 500w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-293x184.jpg 293w\" sizes=\"auto, (max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-4623\" class=\"wp-caption-text\"><noscript><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-4623\" src=\"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1.jpg\" alt=\"\" width=\"1100\" height=\"689\" srcset=\"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1.jpg 1100w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-300x188.jpg 300w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-1024x641.jpg 1024w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-770x482.jpg 770w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-500x313.jpg 500w, https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/Foto1-293x184.jpg 293w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><\/noscript><\/a> <em>Estimated scope of the project<\/em>.<\/figcaption><\/figure>\n<p>To summarise the different technical coating solutions applied by GDES in this project, we have classified the coating systems that are currently in use and described the control methods that guarantee their correct application.<\/p>\n<p>The article classifies these systems according to the technical requirements of each room or cubicle in the facilities, distinguishing between the seven groups shown below:<\/p>\n<ul>\n<li>Standard coating system with no requirement for decontamination.<\/li>\n<li>Standard coating system with requirement for decontamination.<\/li>\n<li>Dust-proof and anti-carbonation coating system.<\/li>\n<li>Coating system with requirements on flatness, high chemical resistance and suitable for heavy traffic.<\/li>\n<li>Coating systems with requirements of leaktightness and resistance to high irradiation.<\/li>\n<li>Coating system with electrostatic conductivity requirements.<\/li>\n<li>Coating system with requirement of resistance to mineral oils.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>ince June 2019, GDES has been participating in the construction of the platform buildings of the ITER project. We have been tasked with applying specific coatings on the building under construction where the machine will be located and its annex buildings: Tokamak, Diagnostic and Tritium. The services of GDES Group were engaged by FUSION FOR ENERGY (F4E), the EU body that manages the EU\u2019s contribution to the ITER project and the construction of the platform buildings. This service will be [&hellip;]<\/p>\n","protected":false},"author":1089,"featured_media":4626,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"mc4wp_mailchimp_campaign":[],"footnotes":""},"categories":[67],"tags":[714,709,713,712],"coauthors":[705,715],"class_list":["post-4631","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology-and-innovation","tag-endurance","tag-spanish-company","tag-tightness","tag-tokamak-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Application of coatings on the Tokamak reactor building for the ITER international project - Technology and Innovation<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Application of coatings on the Tokamak reactor building for the ITER international project - Technology and Innovation\" \/>\n<meta property=\"og:description\" content=\"ince June 2019, GDES has been participating in the construction of the platform buildings of the ITER project. We have been tasked with applying specific coatings on the building under construction where the machine will be located and its annex buildings: Tokamak, Diagnostic and Tritium. The services of GDES Group were engaged by FUSION FOR ENERGY (F4E), the EU body that manages the EU\u2019s contribution to the ITER project and the construction of the platform buildings. This service will be [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Revista Nuclear Espa\u00f1a\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SNE.spain\" \/>\n<meta property=\"article:published_time\" content=\"2020-05-08T14:27:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/foto-grande-1024x576.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Iv\u00e1n Maqueda Iglesias, Salvador Pineda Rodr\u00edguez\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@SNEu235\" \/>\n<meta name=\"twitter:site\" content=\"@SNEu235\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Iv\u00e1n Maqueda Iglesias, Salvador Pineda Rodr\u00edguez\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/\"},\"author\":{\"name\":\"Iv\u00e1n Maqueda Iglesias\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#\\\/schema\\\/person\\\/f2446c362dbbb5ac577d0ff25940e9bb\"},\"headline\":\"Application of coatings on the Tokamak reactor building for the ITER international project\",\"datePublished\":\"2020-05-08T14:27:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/\"},\"wordCount\":446,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/foto-grande.jpg\",\"keywords\":[\"endurance\",\"Spanish company\",\"tightness\",\"Tokamak\"],\"articleSection\":[\"Technology and Innovation\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/\",\"name\":\"Application of coatings on the Tokamak reactor building for the ITER international project - Technology and Innovation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/foto-grande.jpg\",\"datePublished\":\"2020-05-08T14:27:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/foto-grande.jpg\",\"contentUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/foto-grande.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"Work on the floor slab of the central pit, future location of the ITER fusion reactor.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/technology-and-innovation\\\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Application of coatings on the Tokamak reactor building for the ITER international project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/\",\"name\":\"Revista Nuclear Espa\u00f1a\",\"description\":\"Revista de los profesionales del sector nuclear en Espa\u00f1a cuya misi\u00f3n es la divulgaci\u00f3n de la ciencia y tecnolog\u00eda nuclear. El objetivo de la Revista es la publicaci\u00f3n de art\u00edculos y contenidos de car\u00e1cter t\u00e9cnico y divulgativo, en diversas \u00e1reas tem\u00e1ticas como son clima y medioambiente, transici\u00f3n energ\u00e9tica, instalaciones nucleares y radiactivas, tecnolog\u00eda nuclear e innovaci\u00f3n, seguridad nuclear y protecci\u00f3n radiol\u00f3gica, ciclo de combustible, residuos radiactivos.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#organization\",\"name\":\"SPANISH NUCLEAR SOCIETY\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/avatar-NE.jpg\",\"contentUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/avatar-NE.jpg\",\"width\":512,\"height\":512,\"caption\":\"SPANISH NUCLEAR SOCIETY\"},\"image\":{\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/SNE.spain\",\"https:\\\/\\\/x.com\\\/SNEu235\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/#\\\/schema\\\/person\\\/f2446c362dbbb5ac577d0ff25940e9bb\",\"name\":\"Iv\u00e1n Maqueda Iglesias\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ivan-maqueda-100x100.jpg743a89cd691b6521d5f4f4346fc2d4f1\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ivan-maqueda-100x100.jpg\",\"contentUrl\":\"https:\\\/\\\/www.revistanuclear.es\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/ivan-maqueda-100x100.jpg\",\"caption\":\"Iv\u00e1n Maqueda Iglesias\"},\"description\":\"Director de la Unidad de Negocio de Tratamiento de Superficies GDES\",\"url\":\"https:\\\/\\\/www.revistanuclear.es\\\/en\\\/author\\\/ivan_maqueda\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Application of coatings on the Tokamak reactor building for the ITER international project - Technology and Innovation","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/","og_locale":"en_US","og_type":"article","og_title":"Application of coatings on the Tokamak reactor building for the ITER international project - Technology and Innovation","og_description":"ince June 2019, GDES has been participating in the construction of the platform buildings of the ITER project. We have been tasked with applying specific coatings on the building under construction where the machine will be located and its annex buildings: Tokamak, Diagnostic and Tritium. The services of GDES Group were engaged by FUSION FOR ENERGY (F4E), the EU body that manages the EU\u2019s contribution to the ITER project and the construction of the platform buildings. This service will be [&hellip;]","og_url":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/","og_site_name":"Revista Nuclear Espa\u00f1a","article_publisher":"https:\/\/www.facebook.com\/SNE.spain","article_published_time":"2020-05-08T14:27:04+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/foto-grande-1024x576.jpg","type":"image\/jpeg"}],"author":"Iv\u00e1n Maqueda Iglesias, Salvador Pineda Rodr\u00edguez","twitter_card":"summary_large_image","twitter_creator":"@SNEu235","twitter_site":"@SNEu235","twitter_misc":{"Written by":"Iv\u00e1n Maqueda Iglesias, Salvador Pineda Rodr\u00edguez","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/#article","isPartOf":{"@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/"},"author":{"name":"Iv\u00e1n Maqueda Iglesias","@id":"https:\/\/www.revistanuclear.es\/en\/#\/schema\/person\/f2446c362dbbb5ac577d0ff25940e9bb"},"headline":"Application of coatings on the Tokamak reactor building for the ITER international project","datePublished":"2020-05-08T14:27:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/"},"wordCount":446,"commentCount":0,"publisher":{"@id":"https:\/\/www.revistanuclear.es\/en\/#organization"},"image":{"@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/foto-grande.jpg","keywords":["endurance","Spanish company","tightness","Tokamak"],"articleSection":["Technology and Innovation"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/","url":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/","name":"Application of coatings on the Tokamak reactor building for the ITER international project - Technology and Innovation","isPartOf":{"@id":"https:\/\/www.revistanuclear.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/#primaryimage"},"image":{"@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/foto-grande.jpg","datePublished":"2020-05-08T14:27:04+00:00","breadcrumb":{"@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/#primaryimage","url":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/foto-grande.jpg","contentUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/foto-grande.jpg","width":2560,"height":1440,"caption":"Work on the floor slab of the central pit, future location of the ITER fusion reactor."},{"@type":"BreadcrumbList","@id":"https:\/\/www.revistanuclear.es\/en\/technology-and-innovation\/application-of-coatings-on-the-tokamak-reactor-building-for-the-iter-international-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.revistanuclear.es\/en\/"},{"@type":"ListItem","position":2,"name":"Application of coatings on the Tokamak reactor building for the ITER international project"}]},{"@type":"WebSite","@id":"https:\/\/www.revistanuclear.es\/en\/#website","url":"https:\/\/www.revistanuclear.es\/en\/","name":"Revista Nuclear Espa\u00f1a","description":"Revista de los profesionales del sector nuclear en Espa\u00f1a cuya misi\u00f3n es la divulgaci\u00f3n de la ciencia y tecnolog\u00eda nuclear. El objetivo de la Revista es la publicaci\u00f3n de art\u00edculos y contenidos de car\u00e1cter t\u00e9cnico y divulgativo, en diversas \u00e1reas tem\u00e1ticas como son clima y medioambiente, transici\u00f3n energ\u00e9tica, instalaciones nucleares y radiactivas, tecnolog\u00eda nuclear e innovaci\u00f3n, seguridad nuclear y protecci\u00f3n radiol\u00f3gica, ciclo de combustible, residuos radiactivos.","publisher":{"@id":"https:\/\/www.revistanuclear.es\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.revistanuclear.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.revistanuclear.es\/en\/#organization","name":"SPANISH NUCLEAR SOCIETY","url":"https:\/\/www.revistanuclear.es\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.revistanuclear.es\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2019\/11\/avatar-NE.jpg","contentUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2019\/11\/avatar-NE.jpg","width":512,"height":512,"caption":"SPANISH NUCLEAR SOCIETY"},"image":{"@id":"https:\/\/www.revistanuclear.es\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/SNE.spain","https:\/\/x.com\/SNEu235"]},{"@type":"Person","@id":"https:\/\/www.revistanuclear.es\/en\/#\/schema\/person\/f2446c362dbbb5ac577d0ff25940e9bb","name":"Iv\u00e1n Maqueda Iglesias","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/ivan-maqueda-100x100.jpg743a89cd691b6521d5f4f4346fc2d4f1","url":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/ivan-maqueda-100x100.jpg","contentUrl":"https:\/\/www.revistanuclear.es\/wp-content\/uploads\/2020\/04\/ivan-maqueda-100x100.jpg","caption":"Iv\u00e1n Maqueda Iglesias"},"description":"Director de la Unidad de Negocio de Tratamiento de Superficies GDES","url":"https:\/\/www.revistanuclear.es\/en\/author\/ivan_maqueda\/"}]}},"_links":{"self":[{"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/posts\/4631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/users\/1089"}],"replies":[{"embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/comments?post=4631"}],"version-history":[{"count":2,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/posts\/4631\/revisions"}],"predecessor-version":[{"id":4633,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/posts\/4631\/revisions\/4633"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/media\/4626"}],"wp:attachment":[{"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/media?parent=4631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/categories?post=4631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/tags?post=4631"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.revistanuclear.es\/en\/wp-json\/wp\/v2\/coauthors?post=4631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}